Our Customer is our life, giving them the appropriate products for their needs at the lowest costs possible is our goal. We have a solution to fit your requirements.

We believed that Quality and Reliability comes first in everything that we do. It should not be overlooked nor underestimated, that is why we selected key partners to ensure that we have the highest Quality and Reliability of products.

Our Customer is our life, giving them the appropriate products for their needs at the lowest costs possible is our goal. We have a solution to fit your requirements.

We believed that Quality and Reliability comes first in everything that we do. It should not be overlooked nor underestimated, that is why we selected key partners to ensure that we have the highest Quality and Reliability of products.

Our Customer is our life, giving them the appropriate products for their needs at the lowest costs possible is our goal. We have a solution to fit your requirements.

We believed that Quality and Reliability comes first in everything that we do. It should not be overlooked nor underestimated, that is why we selected key partners to ensure that we have the highest Quality and Reliability of products.

Completed / On-Going

PROJECTS

Completed / On-Going

PROJECTS

Completed / On-Going

PROJECTS

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

Fiber Optic (Level 1-7) and Instrument Cabling (Level 3-5) for E and I Automation Dryer 2 Upgrade (Evaporator Area) (September – December 2014)

Fiber Optic Cabling and Termination on Stop and Shop to Security Office (
December 2014)

Fiber Optic Cabling, Verification and Troubleshooting at Dryer 2 and 3 (
January 2015)

Fiber Optic Cabling, Verification / Troubleshooting / Termination at HVAC Office (
February 2015)

Instrument and
 Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 1 (March – April 2015)

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

ELECTRICAL & INSTRUMENTATION WORKS

  • D3 CIP Upgrade
  • D1, D2 & D3 N2 Injection E & I Installation
  • Dryer 1 & Dryer 3 Vaisala E & I Installation
    (November 2017 – March 2018)

MECHANICAL WORKS

  • D1 & D2 Evaporator Chemical Auto Dosing
  • PL3 & PL4 Jacob White & Wac Machine Relocation
  • Fabrication/Installation/Replacement: PL3 VRH KNOCKER
  • Depal Platform Dismantling & Restoration

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 3 (August – December 2015)

Instrument and
 Electrical Cabling (Level 2-7) Project of Dryer 1 (April – December 2016)

Fiber Optic Cabling at Dryer 1 Wet 1 (May – September 2016)

Automation Phase 3 – Dry Blend, Daerator & New DPU to IT AHU PLC (December 2016 – January 2017)

ACCREDITED ELECTRICAL CONTRACTOR OF WYETH PHILIPPINES INC. (In-House Electrical Contractor)
VARIOUS ELECTRICAL & MECHANICAL WORKS AT WYETH (April 2017 – Present)

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

MECHANICAL WORKS

  • Piping Installation of PX Sensors at Dryer 3 Shaking Bed
  • Relocation of PL2 Laser Coder Reject Conveyor
  • Relocation of PL2 Laser Coder & Vision System
  • Fabrication/Repair of Overhead Conveyor
  • Dryer Hammer Air Leak Replacement of Cylinder
  • Modification of Dryer 1/Dryer 2 SILO (1,2,3,4,5,6) Top Bracket
  • Modification of PL2 Palletizer Outfeed Conveyor
  • Modification of Air Line Pipe for WP1 in front of MST
  • Some of the Mechanical Works performed at Wyeth since 2018

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

Fiber Optic (Level 1-7) and Instrument Cabling (Level 3-5) for E and I Automation Dryer 2 Upgrade (Evaporator Area) (September – December 2014)

Fiber Optic Cabling and Termination on Stop and Shop to Security Office (
December 2014)

Fiber Optic Cabling, Verification and Troubleshooting at Dryer 2 and 3 (
January 2015)

Fiber Optic Cabling, Verification / Troubleshooting / Termination at HVAC Office (
February 2015)

Instrument and
 Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 1 (March – April 2015)

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

ELECTRICAL & INSTRUMENTATION WORKS

  • D3 CIP Upgrade
  • D1, D2 & D3 N2 Injection E & I Installation
  • Dryer 1 & Dryer 3 Vaisala E & I Installation
    (November 2017 – March 2018)

MECHANICAL WORKS

  • D1 & D2 Evaporator Chemical Auto Dosing
  • PL3 & PL4 Jacob White & Wac Machine Relocation
  • Fabrication/Installation/Replacement: PL3 VRH KNOCKER
  • Depal Platform Dismantling & Restoration

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 3 (August – December 2015)

Instrument and
 Electrical Cabling (Level 2-7) Project of Dryer 1 (April – December 2016)

Fiber Optic Cabling at Dryer 1 Wet 1 (May – September 2016)

Automation Phase 3 – Dry Blend, Daerator & New DPU to IT AHU PLC (December 2016 – January 2017)

ACCREDITED ELECTRICAL CONTRACTOR OF WYETH PHILIPPINES INC. (In-House Electrical Contractor)
VARIOUS ELECTRICAL & MECHANICAL WORKS AT WYETH (April 2017 – Present)

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

MECHANICAL WORKS

  • Piping Installation of PX Sensors at Dryer 3 Shaking Bed
  • Relocation of PL2 Laser Coder Reject Conveyor
  • Relocation of PL2 Laser Coder & Vision System
  • Fabrication/Repair of Overhead Conveyor
  • Dryer Hammer Air Leak Replacement of Cylinder
  • Modification of Dryer 1/Dryer 2 SILO (1,2,3,4,5,6) Top Bracket
  • Modification of PL2 Palletizer Outfeed Conveyor
  • Modification of Air Line Pipe for WP1 in front of MST
  • Some of the Mechanical Works performed at Wyeth since 2018

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

Fiber Optic (Level 1-7) and Instrument Cabling (Level 3-5) for E and I Automation Dryer 2 Upgrade (Evaporator Area) (September – December 2014)

Fiber Optic Cabling and Termination on Stop and Shop to Security Office (
December 2014)

Fiber Optic Cabling, Verification and Troubleshooting at Dryer 2 and 3 (
January 2015)

Fiber Optic Cabling, Verification / Troubleshooting / Termination at HVAC Office (
February 2015)

Instrument and
 Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 1 (March – April 2015)

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

ELECTRICAL & INSTRUMENTATION WORKS

  • D3 CIP Upgrade
  • D1, D2 & D3 N2 Injection E & I Installation
  • Dryer 1 & Dryer 3 Vaisala E & I Installation
    (November 2017 – March 2018)

MECHANICAL WORKS

  • D1 & D2 Evaporator Chemical Auto Dosing
  • PL3 & PL4 Jacob White & Wac Machine Relocation
  • Fabrication / Installation / Replacement: PL3 VRH KNOCKER
  • Depal Platform Dismantling & Restoration

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 3 (August – December 2015)

Instrument and
 Electrical Cabling (Level 2-7) Project of Dryer 1 (April – December 2016)

Fiber Optic Cabling at Dryer 1 Wet 1 (May – September 2016)

Automation Phase 3 – Dry Blend, Daerator & New DPU to IT AHU PLC (December 2016 – January 2017)

ACCREDITED ELECTRICAL CONTRACTOR OF WYETH PHILIPPINES INC. (In-House Electrical Contractor)
VARIOUS ELECTRICAL & MECHANICAL WORKS AT WYETH (April 2017 – Present)

WYETH PHILIPPINES INC.

STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS

MECHANICAL WORKS

  • Piping Installation of PX Sensors at Dryer 3 Shaking Bed
  • Relocation of PL2 Laser Coder Reject Conveyor
  • Relocation of PL2 Laser Coder & Vision System
  • Fabrication/Repair of Overhead Conveyor
  • Dryer Hammer Air Leak Replacement of Cylinder
  • Modification of Dryer 1/Dryer 2 SILO (1,2,3,4,5,6) Top Bracket
  • Modification of PL2 Palletizer Outfeed Conveyor
  • Modification of Air Line Pipe for WP1 in front of MST
  • Some of the Mechanical Works performed at Wyeth since 2018

SAMSUNG ELECTRO-MECHANIC PHILS. CORPORATION

ELECTRICAL, MECHANICAL & CIVIL WORKS

  • Various Electrical & Mechanical Works for MLCC Production (May - July 2015)
  • Electrical re-writing on Tower Lamp of Box Oven Machines, Painting Works on Box Oven Machines & Stainless Steel Sheet Installation on Building 1 & 2 (September 2015 - March 2016)
  • Electrical & Mechanical Works at MLCC Taping Process and from Plant 1, 2, 3 and 4 (April 2016 - January 2017)

SAMSUNG ELECTRO-MECHANIC PHILS. CORPORATION

ELECTRICAL, MECHANICAL & CIVIL WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF SAMSUNG ELECTRO-MECHANICS PHILS., INC. (In-House Electrical Contractor)

  • Fabrication of Conversion Space Plate of Inductor Termination
  • Railway Modification of MLCC Taping Process
  • Hopper Rework of MLCC Plating
  • Fabrication of Extension Conveyor of MLCC Firing
  • Fabrication of Auto GR Platform of MLCC Tumbling
  • Slurry Filter Assembly Modification
  • Rework of Gear Pump Assembly of MLCC Casting
  • Chipbin Cater of Tantal Casting
  • Fabrication of TR L & R Catcher Bracket Casting
  • Various Electrical & Mechanical Works on All 5 Plants (February 2017 - Present)

SAMSUNG ELECTRO-MECHANIC PHILS. CORPORATION

ELECTRICAL, MECHANICAL & CIVIL WORKS

  • Various Electrical & Mechanical Works for MLCC Production (May - July 2015)
  • Electrical re-writing on Tower Lamp of Box Oven Machines, Painting Works on Box Oven Machines & Stainless Steel Sheet Installation on Building 1 & 2 (September 2015 - March 2016)
  • Electrical & Mechanical Works at MLCC Taping Process and from Plant 1, 2, 3 and 4 (April 2016 - January 2017)

SAMSUNG ELECTRO-MECHANIC PHILS. CORPORATION

ELECTRICAL, MECHANICAL & CIVIL WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF SAMSUNG ELECTRO-MECHANICS PHILS., INC. (In-House Electrical Contractor)

  • Fabrication of Conversion Space Plate of Inductor Termination
  • Railway Modification of MLCC Taping Process
  • Hopper Rework of MLCC Plating
  • Fabrication of Extension Conveyor of MLCC Firing
  • Fabrication of Auto GR Platform of MLCC Tumbling
  • Slurry Filter Assembly Modification
  • Rework of Gear Pump Assembly of MLCC Casting
  • Chipbin Cater of Tantal Casting
  • Fabrication of TR L & R Catcher Bracket Casting
  • Various Electrical & Mechanical Works on All 5 Plants (February 2017 - Present)

SAMSUNG ELECTRO-MECHANIC PHILS. CORPORATION

ELECTRICAL, MECHANICAL & CIVIL WORKS

  • Various Electrical & Mechanical Works for MLCC Production (May - July 2015)
  • Electrical re-writing on Tower Lamp of Box Oven Machines, Painting Works on Box Oven Machines & Stainless Steel Sheet Installation on Building 1 & 2 (September 2015 - March 2016)
  • Electrical & Mechanical Works at MLCC Taping Process and from Plant 1, 2, 3 and 4 (April 2016 - January 2017)

SAMSUNG ELECTRO-MECHANIC PHILS. CORPORATION

ELECTRICAL, MECHANICAL & CIVIL WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF SAMSUNG ELECTRO-MECHANICS PHILS., INC. (In-House Electrical Contractor)

  • Fabrication of Conversion Space Plate of Inductor Termination
  • Railway Modification of MLCC Taping Process
  • Hopper Rework of MLCC Plating
  • Fabrication of Extension Conveyor of MLCC Firing
  • Fabrication of Auto GR Platform of MLCC Tumbling
  • Slurry Filter Assembly Modification
  • Rework of Gear Pump Assembly of MLCC Casting
  • Chipbin Cater of Tantal Casting
  • Fabrication of TR L & R Catcher Bracket Casting
  • Various Electrical & Mechanical Works on All 5 Plants (February 2017 - Present)

EATON INDUSTRIES (PHILIPPINES), LLC

ELECTRICAL & MECHANICAL WORKS

  • Electrical and Cabling on Kaba Clock (July 2015)
  • Electrical and Cabling Works on L405 & L407
  • Supply of Labor and Materials necessary for the Electrical and Cabling Works at L405 & L407 (March 8 - March 28, 2021)
  • Electrical Cabling Works on FA Area
  • Supply of Labor and Materials necessary for the whole FA Area (July 18 - September 15, 2022)

PMFTC PHILIP MORRIS

ELECTRICAL & MECHANICAL WORKS

PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)

  • Upgrade of Pneumatic Slicer (October - December 2019)
  • Electrical and Cabling Works on L405 & L407
  • Supply of Labor and Materials necessary for the Electrical and Cabling Works at L405 & L407 (March 8 - March 28, 2021)

PMFTC PHILIP MORRIS
FPIP TANAUAN BATANGAS

  • Electrical and Cabling Works on IT Room (May - August 2021)

PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)

  • Upgrade of Pneumatic Slicer (April 2019)

SEM-CALACA POWER CORPORATION

STRUCTURED CABLING & ELECTRICAL WORKS

  • Instrument, Control and Power Cabling for the rehabilitation of damaged cables, trays and panels of SCPC Unit 2 (December 2015 - February 2016)
  • Cable Replacement Project of the whole Unit 1 of Turbine and Boiler (July 2018 - August 31, 2019)
  • Low Vacuum Heat Exchanger for Unit 1 Fabrication and Installation of Booster Pump Suction Lines including supports, Discharge Header and line connecting to pumps, Tapping of cooling water lines to close cooling water lines, Installation of control values (November 2022 - December 2022)

ALLIANCE MANSOLS INC. (AMI)

FIRE DETECTION & ALARM SYSTEM,
ELECTRICAL & MECHANICAL WORKS

Smoke Detector and Fire Alarm System Installation of the Whole Plant

ELECTRICAL (All equipment and lightings), MECHANICAL (ACU/N2 and CDA Installation) and CIVIL (Demolition and Construction of New Walls including Installation of New Conductive Tiles on Production Area) Works on the plant expansion of line 4 at AMI Building

EATON INDUSTRIES (PHILIPPINES), LLC

ELECTRICAL & MECHANICAL WORKS

  • Electrical and Cabling on Kaba Clock (July 2015)
  • Electrical and Cabling Works on L405 & L407
  • Supply of Labor and Materials necessary for the Electrical and Cabling Works at L405 & L407 (March 8 - March 28, 2021)
  • Electrical Cabling Works on FA Area
  • Supply of Labor and Materials necessary for the whole FA Area (July 18 - September 15, 2022)

PMFTC PHILIP MORRIS

ELECTRICAL & MECHANICAL WORKS

PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)

  • Upgrade of Pneumatic Slicer (October - December 2019)
  • Electrical and Cabling Works on L405 & L407
  • Supply of Labor and Materials necessary for the Electrical and Cabling Works at L405 & L407 (March 8 - March 28, 2021)

PMFTC PHILIP MORRIS
FPIP TANAUAN BATANGAS

  • Electrical and Cabling Works on IT Room (May - August 2021)

PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)

  • Upgrade of Pneumatic Slicer (April 2019)

SEM-CALACA POWER CORPORATION

STRUCTURED CABLING & ELECTRICAL WORKS

  • Instrument, Control and Power Cabling for the rehabilitation of damaged cables, trays and panels of SCPC Unit 2 (December 2015 - February 2016)
  • Cable Replacement Project of the whole Unit 1 of Turbine and Boiler (July 2018 - August 31, 2019)
  • Low Vacuum Heat Exchanger for Unit 1 Fabrication and Installation of Booster Pump Suction Lines including supports, Discharge Header and line connecting to pumps, Tapping of cooling water lines to close cooling water lines, Installation of control values (November 2022 - December 2022)

ALLIANCE MANSOLS INC. (AMI)

FIRE DETECTION & ALARM SYSTEM,
ELECTRICAL & MECHANICAL WORKS

Smoke Detector and Fire Alarm System Installation of the Whole Plant

ELECTRICAL (All equipment and lightings), MECHANICAL (ACU/N2 and CDA Installation) and CIVIL (Demolition and Construction of New Walls including Installation of New Conductive Tiles on Production Area) Works on the plant expansion of line 4 at AMI Building

EATON INDUSTRIES (PHILIPPINES), LLC

ELECTRICAL & MECHANICAL WORKS

  • Electrical and Cabling on Kaba Clock (July 2015)
  • Electrical and Cabling Works on L405 & L407
  • Supply of Labor and Materials necessary for the Electrical and Cabling Works at L405 & L407 (March 8 - March 28, 2021)
  • Electrical Cabling Works on FA Area
  • Supply of Labor and Materials necessary for the whole FA Area (July 18 - September 15, 2022)

SEM-CALACA POWER CORPORATION

STRUCTURED CABLING & ELECTRICAL WORKS

  • Instrument, Control and Power Cabling for the rehabilitation of damaged cables, trays and panels of SCPC Unit 2 (December 2015 - February 2016)
  • Cable Replacement Project of the whole Unit 1 of Turbine and Boiler (July 2018 - August 31, 2019)
  • Low Vacuum Heat Exchanger for Unit 1 Fabrication and Installation of Booster Pump Suction Lines including supports, Discharge Header and line connecting to pumps, Tapping of cooling water lines to close cooling water lines, Installation of control values (November 2022 - December 2022)

PMFTC PHILIP MORRIS

ELECTRICAL & MECHANICAL WORKS

PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)

  • Upgrade of Pneumatic Slicer (October - December 2019)
  • Electrical and Cabling Works on L405 & L407
  • Supply of Labor and Materials necessary for the Electrical and Cabling Works at L405 & L407 (March 8 - March 28, 2021)

PMFTC PHILIP MORRIS
FPIP TANAUAN BATANGAS

  • Electrical and Cabling Works on IT Room (May - August 2021)

PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)

  • Upgrade of Pneumatic Slicer (April 2019)

ALLIANCE MANSOLS INC. (AMI)

FIRE DETECTION & ALARM SYSTEM,
ELECTRICAL & MECHANICAL WORKS

Smoke Detector and Fire Alarm System Installation of the Whole Plant

ELECTRICAL (All equipment and lightings), MECHANICAL (ACU/N2 and CDA Installation) and CIVIL (Demolition and Construction of New Walls including Installation of New Conductive Tiles on Production Area) Works on the plant expansion of line 4 at AMI Building

HYPERCOM ASIA

STRUCTURED CABLING SYSTEM

Cabling and Termination Works using CAT5E on the 21st floor

VERIFONE GLOBAL DEVELOPMENT CENTRE PHILIPPINES INC.

STRUCTURED CABLING SYSTEM & ELECTRICAL WORKS

Structured Cabling and Electrical Works for the Office Merge of MNL and MNL2 using CAT6 and Fiber Optics on 17th and 32nd Floor

AMELCO DESICCANTS INC.

ELECTRICAL & MECHANICAL WORKS

Electrical – Mechanical Audit of the Whole Plant

DAIHO (Philippines, Inc)

ELECTRICAL & MECHANICAL WORKS

Electrical and Mechanical (CDA and ACU) Installation on DAIHO Kitting Room (April – June 2015)

NESTLE PHILIPPINES, INC.

ELECTRICAL & INSTRUMENTATION WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF NESTLE PHILIPPINES, INC.

  • NESTLE CABUYAO PLANT
    Homogenizer Upgrade (October 2018)
  • NESTLE TANAUAN PLANT
    RTD New Building (October – November 2018)

UNILEVER PHILIPPINES, INC.

ELECTRICAL WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF UNILEVER PHILIPPINES, INC.
UNILEVER MEGA DC (Cabuyao, Laguna)

  • Fire Detection and Alarm System (FDAS)
  • WIFI and AP Relocation
  • CCTV Installation (September 2019 – March 2020)

FESTO

ELECTRICAL & MECHANICAL WORKS

FESTO LOGISTIC DEPARTMENT

Km 18 West Service Road South Super Highway, Paranaque City 1700

  • Repair and Transfer of Panel Control at Pampanga Area (October 7 – December 20, 2021)

SOUTHWEST LUZON POWER GENERATION

MECHANICAL WORKS

  • Inspection and Repair of Air & Fuel Gas Ducts, Expansion Joints, Dampers, Supports and Casing of Unit-4 (January 8 2023 – Present)
  • Unit-4 Various Mechanical Maintenance Activities at Turbine Areas (January 8, 2023 – Present)

LAGUNA INTERNATIONAL INDUSTRIAL PARK ASSOCIATION INC (LIIPAI)

ELECTRICAL WORKS

Electrical Works on Reconstruction of MERALCO Service Entrance at PUMP 7 (May 2016)

HGST PHILIPPINES CORP. (WESTERN DIGITAL)

ELECTRICAL WORKS

  • ROCDI Pure Water Treatment System Expansion (June – November 2020)
  • ROCDI Pure Water Treatment System Expansion (January 15 – April 28, 2022)

ASIA BREWERY INCORPORATED

ELECTRICAL WORKS

ASIA BREWERY CABUYAO LAGUNA

  • Fiber Optic Cabling (September 2019 – December 2019)

ARMSCOR GLOBAL DEFENSE INC.

MECHANICAL WORKS

Armscor Ave., Barangay Fortune, Marikina City

  • Bliss Extrusion HYD Supply and Installation
  • Hydraulic High Pressure Hose Installation (February 2021)

SENSIENT TECHNOLOGIES (PHILIPPINES), INC.

ELECTRICAL WORKS

Fabrication and Installation of Stainless Steel Cable Tray (December 2016)

UNIVERSAL ROBINA CORPORATION

ELECTRICAL WORKS

URC CAVITE PLANT
Thru Festo Philippines

  • Water Stopper Project (June 2019)

GHD

STRUCTURED CABLING & ELECTRICAL WORKS

GHD 17th Floor Panorama Technocenter 1029 EDSA Quezon City

  • Structured Cabling and Electrical Works (October 2019 – January 2020)

ENDRESS + HAUSER PHILIPPINES

MECHANICAL WORKS

Unit 803, One World Place Bldg., 32nd St., BGC 1630 Taguig City, Metro Manila

  • RIG Calibrator Machine Upgrade (October 2021)

HYPERCOM ASIA

STRUCTURED CABLING SYSTEM

Cabling and Termination Works using CAT5E on the 21st floor

VERIFONE GLOBAL DEVELOPMENT CENTRE PHILIPPINES INC.

STRUCTURED CABLING SYSTEM & ELECTRICAL WORKS

Structured Cabling and Electrical Works for the Office Merge of MNL and MNL2 using CAT6 and Fiber Optics on 17th and 32nd Floor

AMELCO DESICCANTS INC.

ELECTRICAL & MECHANICAL WORKS

Electrical – Mechanical Audit of the Whole Plant

DAIHO (Philippines, Inc)

ELECTRICAL & MECHANICAL WORKS

Electrical and Mechanical (CDA and ACU) Installation on DAIHO Kitting Room (April – June 2015)

NESTLE PHILIPPINES, INC.

ELECTRICAL & INSTRUMENTATION WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF NESTLE PHILIPPINES, INC.

  • NESTLE CABUYAO PLANT
    Homogenizer Upgrade (October 2018)
  • NESTLE TANAUAN PLANT
    RTD New Building (October – November 2018)

UNILEVER PHILIPPINES, INC.

ELECTRICAL WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF UNILEVER PHILIPPINES, INC.
UNILEVER MEGA DC (Cabuyao, Laguna)

  • Fire Detection and Alarm System (FDAS)
  • WIFI and AP Relocation
  • CCTV Installation (September 2019 – March 2020)

FESTO

ELECTRICAL & MECHANICAL WORKS

FESTO LOGISTIC DEPARTMENT

Km 18 West Service Road South Super Highway, Paranaque City 1700

  • Repair and Transfer of Panel Control at Pampanga Area (October 7 – December 20, 2021)

SOUTHWEST LUZON POWER GENERATION

MECHANICAL WORKS

  • Inspection and Repair of Air & Fuel Gas Ducts, Expansion Joints, Dampers, Supports and Casing of Unit-4 (January 8 2023 – Present)
  • Unit-4 Various Mechanical Maintenance Activities at Turbine Areas (January 8, 2023 – Present)

LAGUNA INTERNATIONAL INDUSTRIAL PARK ASSOCIATION INC (LIIPAI)

ELECTRICAL WORKS

Electrical Works on Reconstruction of MERALCO Service Entrance at PUMP 7 (May 2016)

HGST PHILIPPINES CORP. (WESTERN DIGITAL)

ELECTRICAL WORKS

  • ROCDI Pure Water Treatment System Expansion (June – November 2020)
  • ROCDI Pure Water Treatment System Expansion (January 15 – April 28, 2022)

ASIA BREWERY INCORPORATED

ELECTRICAL WORKS

ASIA BREWERY CABUYAO LAGUNA

  • Fiber Optic Cabling (September 2019 – December 2019)

ARMSCOR GLOBAL DEFENSE INC.

MECHANICAL WORKS

Armscor Ave., Barangay Fortune, Marikina City

  • Bliss Extrusion HYD Supply and Installation
  • Hydraulic High Pressure Hose Installation (February 2021)

SENSIENT TECHNOLOGIES (PHILIPPINES), INC.

ELECTRICAL WORKS

Fabrication and Installation of Stainless Steel Cable Tray (December 2016)

UNIVERSAL ROBINA CORPORATION

ELECTRICAL WORKS

URC CAVITE PLANT
Thru Festo Philippines

  • Water Stopper Project (June 2019)

GHD

STRUCTURED CABLING & ELECTRICAL WORKS

GHD 17th Floor Panorama Technocenter 1029 EDSA Quezon City

  • Structured Cabling and Electrical Works (October 2019 – January 2020)

ENDRESS + HAUSER PHILIPPINES

MECHANICAL WORKS

Unit 803, One World Place Bldg., 32nd St., BGC 1630 Taguig City, Metro Manila

  • RIG Calibrator Machine Upgrade (October 2021)

HYPERCOM ASIA

STRUCTURED CABLING SYSTEM

Cabling and Termination Works using CAT5E on the 21st floor

VERIFONE GLOBAL DEVELOPMENT CENTRE PHILIPPINES INC.

STRUCTURED CABLING SYSTEM & ELECTRICAL WORKS

Structured Cabling and Electrical Works for the Office Merge of MNL and MNL2 using CAT6 and Fiber Optics on 17th and 32nd Floor

AMELCO DESICCANTS INC.

ELECTRICAL & MECHANICAL WORKS

Electrical – Mechanical Audit of the Whole Plant

DAIHO (Philippines, Inc)

ELECTRICAL & MECHANICAL WORKS

Electrical and Mechanical (CDA and ACU) Installation on DAIHO Kitting Room (April – June 2015)

LAGUNA INTERNATIONAL INDUSTRIAL PARK ASSOCIATION INC (LIIPAI)

ELECTRICAL WORKS

Electrical Works on Reconstruction of MERALCO Service Entrance at PUMP 7 (May 2016)

SENSIENT TECHNOLOGIES (PHILIPPINES), INC.

ELECTRICAL WORKS

Fabrication and Installation of Stainless Steel Cable Tray (December 2016)

NESTLE PHILIPPINES, INC.

ELECTRICAL & INSTRUMENTATION WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF NESTLE PHILIPPINES, INC.

  • NESTLE CABUYAO PLANT
    Homogenizer Upgrade (October 2018)
  • NESTLE TANAUAN PLANT
    RTD New Building (October – November 2018)

HGST PHILIPPINES CORP. (WESTERN DIGITAL)

ELECTRICAL WORKS

  • ROCDI Pure Water Treatment System Expansion (June – November 2020)
  • ROCDI Pure Water Treatment System Expansion (January 15 – April 28, 2022)

UNIVERSAL ROBINA CORPORATION

ELECTRICAL WORKS

URC CAVITE PLANT
Thru Festo Philippines

  • Water Stopper Project (June 2019)

UNILEVER PHILIPPINES, INC.

ELECTRICAL WORKS

ACCREDITED ELECTRICAL CONTRACTOR OF UNILEVER PHILIPPINES, INC.
UNILEVER MEGA DC (Cabuyao, Laguna)

  • Fire Detection and Alarm System (FDAS)
  • WIFI and AP Relocation
  • CCTV Installation (September 2019 – March 2020)

ASIA BREWERY INCORPORATED

ELECTRICAL WORKS

ASIA BREWERY CABUYAO LAGUNA

  • Fiber Optic Cabling (September 2019 – December 2019)

GHD

STRUCTURED CABLING & ELECTRICAL WORKS

GHD 17th Floor Panorama Technocenter 1029 EDSA Quezon City

  • Structured Cabling and Electrical Works (October 2019 – January 2020)

FESTO

ELECTRICAL & MECHANICAL WORKS

FESTO LOGISTIC DEPARTMENT

Km 18 West Service Road South Super Highway, Paranaque City 1700

  • Repair and Transfer of Panel Control at Pampanga Area (October 7 – December 20, 2021)

ARMSCOR GLOBAL DEFENSE INC.

MECHANICAL WORKS

Armscor Ave., Barangay Fortune, Marikina City

  • Bliss Extrusion HYD Supply and Installation
  • Hydraulic High Pressure Hose Installation (February 2021)

ENDRESS + HAUSER PHILIPPINES

MECHANICAL WORKS

Unit 803, One World Place Bldg., 32nd St., BGC 1630 Taguig City, Metro Manila

  • RIG Calibrator Machine Upgrade (October 2021)

SOUTHWEST LUZON POWER GENERATION

MECHANICAL WORKS

  • Inspection and Repair of Air & Fuel Gas Ducts, Expansion Joints, Dampers, Supports and Casing of Unit-4 (January 8 2023 – Present)
  • Unit-4 Various Mechanical Maintenance Activities at Turbine Areas (January 8, 2023 – Present)