Our Customer is our life, giving them the appropriate products for their needs at the lowest costs possible is our goal. We have a solution to fit your requirements.
We believed that Quality and Reliability comes first in everything that we do. It should not be overlooked nor underestimated, that is why we selected key partners to ensure that we have the highest Quality and Reliability of products.
Our Customer is our life, giving them the appropriate products for their needs at the lowest costs possible is our goal. We have a solution to fit your requirements.
We believed that Quality and Reliability comes first in everything that we do. It should not be overlooked nor underestimated, that is why we selected key partners to ensure that we have the highest Quality and Reliability of products.
Our Customer is our life, giving them the appropriate products for their needs at the lowest costs possible is our goal. We have a solution to fit your requirements.
We believed that Quality and Reliability comes first in everything that we do. It should not be overlooked nor underestimated, that is why we selected key partners to ensure that we have the highest Quality and Reliability of products.
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
Fiber Optic (Level 1-7) and Instrument Cabling (Level 3-5) for E and I Automation Dryer 2 Upgrade (Evaporator Area) (September – December 2014)
Fiber Optic Cabling and Termination on Stop and Shop to Security Office (December 2014)
Fiber Optic Cabling, Verification and Troubleshooting at Dryer 2 and 3 (January 2015)
Fiber Optic Cabling, Verification / Troubleshooting / Termination at HVAC Office (February 2015)
Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 1 (March – April 2015)
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
ELECTRICAL & INSTRUMENTATION WORKS
MECHANICAL WORKS
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 3 (August – December 2015)
Instrument and Electrical Cabling (Level 2-7) Project of Dryer 1 (April – December 2016)
Fiber Optic Cabling at Dryer 1 Wet 1 (May – September 2016)
Automation Phase 3 – Dry Blend, Daerator & New DPU to IT AHU PLC (December 2016 – January 2017)
ACCREDITED ELECTRICAL CONTRACTOR OF WYETH PHILIPPINES INC. (In-House Electrical Contractor)
VARIOUS ELECTRICAL & MECHANICAL WORKS AT WYETH (April 2017 – Present)
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
MECHANICAL WORKS
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
Fiber Optic (Level 1-7) and Instrument Cabling (Level 3-5) for E and I Automation Dryer 2 Upgrade (Evaporator Area) (September – December 2014)
Fiber Optic Cabling and Termination on Stop and Shop to Security Office (December 2014)
Fiber Optic Cabling, Verification and Troubleshooting at Dryer 2 and 3 (January 2015)
Fiber Optic Cabling, Verification / Troubleshooting / Termination at HVAC Office (February 2015)
Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 1 (March – April 2015)
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
ELECTRICAL & INSTRUMENTATION WORKS
MECHANICAL WORKS
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 3 (August – December 2015)
Instrument and Electrical Cabling (Level 2-7) Project of Dryer 1 (April – December 2016)
Fiber Optic Cabling at Dryer 1 Wet 1 (May – September 2016)
Automation Phase 3 – Dry Blend, Daerator & New DPU to IT AHU PLC (December 2016 – January 2017)
ACCREDITED ELECTRICAL CONTRACTOR OF WYETH PHILIPPINES INC. (In-House Electrical Contractor)
VARIOUS ELECTRICAL & MECHANICAL WORKS AT WYETH (April 2017 – Present)
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
MECHANICAL WORKS
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
Fiber Optic (Level 1-7) and Instrument Cabling (Level 3-5) for E and I Automation Dryer 2 Upgrade (Evaporator Area) (September – December 2014)
Fiber Optic Cabling and Termination on Stop and Shop to Security Office (December 2014)
Fiber Optic Cabling, Verification and Troubleshooting at Dryer 2 and 3 (January 2015)
Fiber Optic Cabling, Verification / Troubleshooting / Termination at HVAC Office (February 2015)
Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 1 (March – April 2015)
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
ELECTRICAL & INSTRUMENTATION WORKS
MECHANICAL WORKS
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
Instrument and Electrical Cabling (Level 2-7) for Safety Project Upgrade of Dryer 3 (August – December 2015)
Instrument and Electrical Cabling (Level 2-7) Project of Dryer 1 (April – December 2016)
Fiber Optic Cabling at Dryer 1 Wet 1 (May – September 2016)
Automation Phase 3 – Dry Blend, Daerator & New DPU to IT AHU PLC (December 2016 – January 2017)
ACCREDITED ELECTRICAL CONTRACTOR OF WYETH PHILIPPINES INC. (In-House Electrical Contractor)
VARIOUS ELECTRICAL & MECHANICAL WORKS AT WYETH (April 2017 – Present)
STRUCTURED CABLING SYSTEM, ELECTRICAL, INSTRUMENTATION & MECHANICAL WORKS
MECHANICAL WORKS
ELECTRICAL, MECHANICAL & CIVIL WORKS
ELECTRICAL, MECHANICAL & CIVIL WORKS
ACCREDITED ELECTRICAL CONTRACTOR OF SAMSUNG ELECTRO-MECHANICS PHILS., INC. (In-House Electrical Contractor)
ELECTRICAL, MECHANICAL & CIVIL WORKS
ELECTRICAL, MECHANICAL & CIVIL WORKS
ACCREDITED ELECTRICAL CONTRACTOR OF SAMSUNG ELECTRO-MECHANICS PHILS., INC. (In-House Electrical Contractor)
ELECTRICAL, MECHANICAL & CIVIL WORKS
ELECTRICAL, MECHANICAL & CIVIL WORKS
ACCREDITED ELECTRICAL CONTRACTOR OF SAMSUNG ELECTRO-MECHANICS PHILS., INC. (In-House Electrical Contractor)
ELECTRICAL & MECHANICAL WORKS
ELECTRICAL & MECHANICAL WORKS
PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)
PMFTC PHILIP MORRIS
FPIP TANAUAN BATANGAS
PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)
STRUCTURED CABLING & ELECTRICAL WORKS
FIRE DETECTION & ALARM SYSTEM,
ELECTRICAL & MECHANICAL WORKS
Smoke Detector and Fire Alarm System Installation of the Whole Plant
ELECTRICAL (All equipment and lightings), MECHANICAL (ACU/N2 and CDA Installation) and CIVIL (Demolition and Construction of New Walls including Installation of New Conductive Tiles on Production Area) Works on the plant expansion of line 4 at AMI Building
ELECTRICAL & MECHANICAL WORKS
ELECTRICAL & MECHANICAL WORKS
PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)
PMFTC PHILIP MORRIS
FPIP TANAUAN BATANGAS
PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)
STRUCTURED CABLING & ELECTRICAL WORKS
FIRE DETECTION & ALARM SYSTEM,
ELECTRICAL & MECHANICAL WORKS
Smoke Detector and Fire Alarm System Installation of the Whole Plant
ELECTRICAL (All equipment and lightings), MECHANICAL (ACU/N2 and CDA Installation) and CIVIL (Demolition and Construction of New Walls including Installation of New Conductive Tiles on Production Area) Works on the plant expansion of line 4 at AMI Building
ELECTRICAL & MECHANICAL WORKS
STRUCTURED CABLING & ELECTRICAL WORKS
ELECTRICAL & MECHANICAL WORKS
PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)
PMFTC PHILIP MORRIS
FPIP TANAUAN BATANGAS
PMFTC PHILIP MORRIS MARIKINA (Thru Festo Philippines)
FIRE DETECTION & ALARM SYSTEM,
ELECTRICAL & MECHANICAL WORKS
Smoke Detector and Fire Alarm System Installation of the Whole Plant
ELECTRICAL (All equipment and lightings), MECHANICAL (ACU/N2 and CDA Installation) and CIVIL (Demolition and Construction of New Walls including Installation of New Conductive Tiles on Production Area) Works on the plant expansion of line 4 at AMI Building
Copyright 2014 © THEMIS Enterprise Inc. ®™
All Rights Reserved.
Designed By: Almira C. Espiritu © 2024 ®™
Copyright 2014 ©
THEMIS Enterprise Inc. ®™
All Rights Reserved.
Designed By:
Almira C. Espiritu © 2024 ®™
Copyright 2014 ©
THEMIS Enterprise Inc. ®™
All Rights Reserved.
Designed By:
®™ Almira C. Espiritu © 2024